Mobile
Log In Sign Up
Home > english-chinese > "rock classification" in Chinese

Chinese translation for "rock classification"

岩石分类

Related Translations:
mechanical classification:  坏分级机械分级
classification analysis:  分类分析
classification anatomy:  分层解剖学
norm classification:  标准矿物分类法
classification categories:  保密类别
cipw classification:  cipw分类
ecological classification:  生态分类
classification stage:  分类阶段
hybrid classification:  混合分类
enzyme classification:  酶的分类酶分类法
Example Sentences:
1.The idealized mode distinguishing method in surrounding rock classification
围岩分类中的理想模式识别方法
2.Fuzzy judgment advanced model and its application for surrounding rocks classification in tunnels
隧道围岩分类模糊评判改进模型及应用
3.Classification and nomenclature schemes of the rocks classification and nomenclature schemes of metamorphic rocks
变质岩岩石的分类和命名方案
4.Classification and nomenclature schemes of the rocks classification and nomenclature schemes of metamorphic rocks
岩石分类和命名方案变质岩岩石的分类和命名方案
5.( 3 ) a set of classified scheme is established , and surrounding rock classification fast estimate system based on fuzzy inference is developed , which open a new way for estimating classification of surrounding rock
( 3 )制定了一套适用于鹧鸪山隧道施工阶段的围岩分类方案,并研制了基于模糊逻辑推理的围岩类别快速判定系统,为围岩类别判定开辟了一条新的途径。
6.And besides , the dissertation develops the contents of traditional information construction , brings wall rock classification , high crustal stress distinguishing and rock pressure burst forecasting into information construction category , in this way , the information construction is more applicable and perfect
并且,本文拓展了传统信息化施工的内涵,将施工地质跟踪调查与测试、围岩分类、高地应力判别和岩爆预测也纳入了信息化施工范畴。
7.Furthermore tunnel structure commonly is designed by analogy method . on design , often , normally in view of safe consideration , adopt the method that reduction surrounds rock classification and uses fussy construction technology . so as soon as coming , engineering investment is certainly increased and construction project time is prolonged
且隧道结构一般按类比法设计,出于安全考虑,设计上一般采用降低围岩类别,使用复杂的施工工艺来提高施工的安全性,这样无形中增加了工程投资费用且延长了施工工期。
8.( 2 ) taking the geology analysis as main way and combining the pre - test , predicating the tunnel ' s main geology condition ( rock quality , surrounding rock classification , long - wide joint , fault , ground water , crustal stress ) , and predicating the main potential disaster ( collapse , breaking water , rockburst , large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field , finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot , and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel
通过地质分析、类比分析、监控量测、数值模拟、神经网络等方法,对鹧鸪山隧道潜在的主要地质灾害(塌方、涌水、岩爆和大变形)进行了预测预报( 3 )在现场地应力测试成果的基础上,运用数值计算进行应力场反演,基本查明了沿隧道轴线剖面的地应力分布规律:地应力量级在最大埋深附近达到最大值24mpa ,并预测k2 + 260 k3 + 000段将很可能成为鹧鸪山隧道的高地应力段。 ( 4 )塌方往往与断层破碎带及千枚岩相联系。
9.A new method of gaining the characters of rock and soil from the blasting drilling is studied , which is different from general methods and more economic and accurate than them . and a new rock classification is discussed , which involves fuzzy integrated judge method and the affecting factors of drilling
为更好地进行后期的爆破设计如炸药与岩石的优化匹配等,本文综合考虑各种影响钻机钻孔速度的因素,首次提出了采用模糊综合评判的方法对钻孔中获取其性质的岩石进行分级。
Similar Words:
"rock chemie" Chinese translation, "rock chemistry" Chinese translation, "rock chestnut oak" Chinese translation, "rock chopping machine" Chinese translation, "rock city" Chinese translation, "rock clay" Chinese translation, "rock cleavage" Chinese translation, "rock cliff" Chinese translation, "rock climber" Chinese translation, "rock climbing" Chinese translation